Point

Several options exist for bus traffic to pass the Point Luas stop and continue onto the reserved right of way onto East Wall Road. Kerb guidance would be required for some paths but not for others. The barrier at the end of the Luas line will have to be removed. Some protection may be required over paved surface to spread loads and prevent damage.